RSS

Tag Archives: reference

For Better Understanding


Defect Management Process

Defect management process

  • Defect Prevention  – Implementation of techniques, methodology and standard processes to reduce the risk of defects.
  •  Deliverable Baseline  – Establishment of milestones where deliverable will be considered complete and ready for further development work.  When a deliverable is base lined, any further changes are controlled.  Errors in a deliverable are not considered defects until after the deliverable is base lined.
  •  Defect Discovery  – Identification and reporting of defects for development team acknowledgment.  A defect is only termed discovered when it has been documented and acknowledged as a valid defect by the development team member(s) responsible for the component(s) in error.
  •  Defect Resolution  – Work by the development team to prioritize, schedule and fix a defect, and document the resolution.  This also includes notification back to the tester to ensure that the resolution is verified.
  •  Process Improvement — Identification and analysis of the process in which a defect originated to identify ways to improve the process to prevent future occurrences of similar defects.  Also the validation process that should have identified the defect earlier is analyzed to determine ways to strengthen that process.
  •  Management Reporting  – Analysis and reporting of defect information to assist management with risk management, process improvement and project management.

Verification and Validation detail image

verification and validation detail image

Validation(FDA): Establishing documented evidence which provides a high degree of assurance that a specific                            process will consistently produce a product meeting its predetermined specifications and                                 quality attributes. Contrast with data validation.

Validation, Verification, and Testing (NIST): Used as an entity to define a procedure of review, analysis, and                                                                       testing throughout the software life cycle to discover errors,                                                                            determine functionality, and ensure the production of quality                                                                            software.

Verification, Software (NBS): In general the demonstration of consistency, completeness, and correctness of                                              the software at each stage and between each stage of the development life                                                      cycle. See: validation, software.

kevalshah.in
Advertisements
 

Tags: , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

HOW TO ANDROID APPLICATIONS TEST?


ANDROID APPLICATIONS TEST

Test Plan

Android testing has several approaches:

  • Test Android implementations: it’s the object of CTS
  • Test mobile application: it’s the object of this document

To complete these tests, the user can use tools:

  • CTS has automated the test plan
  • This document proposes a test plan manually ran but during the event different solutions to partially automate these tests will be tested

    1. Introduction

    CTS are designed to test Android implementations.

    This test plan is designed to test Android mobile applications. The test cases are intended to be ran manually. But some parts can be automated with specific tools.

    1. Pre-Tests

    This section provides general tests about launching the application.

    2.1. Is the application launched successfully? Yes/No

    2.2. Once launched, does the application gain control?

    Yes/No

    2.3. Does the installation of your application not interfere with the pre-installed applications?

    Yes /No

    2.4. Can you come back to the application main menu screen in less than 3 seconds?

    Yes/No

    kevalshah.in

    Read the rest of this entry »

     

    Tags: , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

    questions and Answers


    1. Load Testing Tools  (Per. Testing)

    a)    reduces the time spent by the testers

    b)    reduces the resources spent (hardware)

    c)    mostly used in web testing

    d)   all  of the above

     

    2. Test coverage analysis is the process of  (Testing concepts)

    a)   Creating additional test cases to increase coverage

    b)    Finding areas of program exercised by the test cases

    c)    Determining a quantitative measure of code coverage, which is a direct measure of quality.

    d)    All of the above.

    3. Critical in Web Testing (Testing concepts)

    a)    Performance and Functionality

    b)    Functionality and usability

    c)   Usability and Performance

    d)    None of the above

    4. Class testing  (Testing concepts)

    a)   require a driver to test

    b)    no need of instances of other classes

    c)    no need to test the transitions

    d)    all of the above.

    5. Defect Tracking  (Defect Mgmt)

    a)    is the communication channel between test team and development team

    b)    is the communication channel between testing team and the rest of the team

    c)    is the communication channel between the testing team and end users

    d)   all of the above

    kevalshah.in

    Read the rest of this entry »

     

    Tags: , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

    Shirdi vale sai baba live darshan


    Sai Darshan

    Click on link :- http://www.shrisaibabasansthan.org/darshan.html

     

     

    kevalshah.in

     

    Tags: , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

     
    %d bloggers like this: